{"id":86,"date":"2015-11-24T07:44:12","date_gmt":"2015-11-24T07:44:12","guid":{"rendered":"http:\/\/www.rushwa.de\/?page_id=86"},"modified":"2022-09-12T11:05:04","modified_gmt":"2022-09-12T11:05:04","slug":"21-2","status":"publish","type":"page","link":"https:\/\/www.rushwa.de\/?page_id=86","title":{"rendered":"Central Line up to 2015"},"content":{"rendered":"<h3>\u00a0<\/h3>\n<h3>\u00a0<\/h3>\n<h3>2015-08-12 TANZANIA INVESTING IN RAILWAYS<\/h3>\n<p>Meldung von RailwaysAfrika 12 August 2015: Tanzania, Burundi and Rwanda suchen nach Investoren f\u00fcr den Bau der neue 1.661 Kilometer langen Standardspurbahn. Die Kosten werden auf<strong> 7,6 Milliarden US-Dollar<\/strong> gesch\u00e4tzt. \u201cProspective investors will design, finance, construct, operate and maintain the line under a public private partnership in collaboration with the Rwanda Transport Development Agency (RTDA).\u201d<\/p>\n<p><a href=\"http:\/\/www.railwaysafrica.com\/news\/tanzania-investing-in-railways\">www.railwaysafrica.com\/news\/tanzania-investing-in-railways<\/a> (abgerufen 2015-11-12)<\/p>\n<hr \/>\n<h3>2015-06-07 <strong>Tanzanian standard gauge contracts announced<\/strong><\/h3>\n<p>Meldung von railwaygazette 7 Jun 2015: A Chinese consortium led by China Railway Materials has been awarded a US$7\u00b76bn contract to build a 2561 km standard gauge railway from Dar es Salaam to Burundi and Rwanda, Minister of Transport Samuel Sitta told parliament on May 30. Construction could be formally launched within weeks<\/p>\n<p>Sitta said the consortium would finance 10% of the costs, while financial adviser Rothschilds is finalising procedures for sourcing the remaining financing through commercial banks.<\/p>\n<p>Meanwhile, China Railway No 2 Engineering Group Co Ltd has signed a US$1\u00b74bn framework agreement for the construction of a 1000 km line in the south of the country to link coal and iron ore mines at Ludewa with the Indian Ocean port of Mtwara (RG 9.11 p25).<\/p>\n<p><a href=\"http:\/\/www.railwaygazette.com\/news\/infrastructure\/single-view\/view\/tanzanian-standard-gauge-contracts-announced.html\">http:\/\/www.railwaygazette.com\/news\/infrastructure\/single-view\/view\/tanzanian-standard-gauge-contracts-announced.html<\/a> (abgerufen 2016-03-09)<\/p>\n<hr \/>\n<h3>Der Fahrplan Dar es Salaam &#8211; Kigomao und Mwanza<\/h3>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-1646\" src=\"http:\/\/www.rushwa.de\/wp-content\/uploads\/Fahrplan-Dar-Kigoma-300x101.jpg\" alt=\"Fahrplan-Dar-Kigoma\" width=\"675\" height=\"227\" srcset=\"https:\/\/www.rushwa.de\/wp-content\/uploads\/Fahrplan-Dar-Kigoma-300x101.jpg 300w, https:\/\/www.rushwa.de\/wp-content\/uploads\/Fahrplan-Dar-Kigoma.jpg 917w\" sizes=\"auto, (max-width: 675px) 100vw, 675px\" \/><\/p>\n<p>http:\/\/www.seat61.com\/Zambia.htm#Tanzania%20Railways (abgerufen 17. M\u00e4rz 2016)<\/p>\n<hr \/>\n<h3>2015-03-25 <strong>Museveni in Tanzania for central corridor rail meet<\/strong><\/h3>\n<p>Meldung von Newvision. By Vision Reporter. Publish Date: Mar 25, 2015 (Ausz\u00fcge): President Yoweri Museveni is in Dar-es- Salaam, Tanzania to join other East African leaders in the historic summit that will witness the launching of the construction of the Central Corridor Railway-line that will link up land locked countries of the region to the Port of Dar-es-Salaam to ease the movement of cargo.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-1593\" src=\"http:\/\/www.rushwa.de\/wp-content\/uploads\/newvision-Dar-300x180.jpg\" alt=\"newvision-Dar\" width=\"528\" height=\"317\" srcset=\"https:\/\/www.rushwa.de\/wp-content\/uploads\/newvision-Dar-300x180.jpg 300w, https:\/\/www.rushwa.de\/wp-content\/uploads\/newvision-Dar.jpg 502w\" sizes=\"auto, (max-width: 528px) 100vw, 528px\" \/><br \/>Other leaders who will attend the summit at Julius Nyerere International Conference Centre include the host President Jakaya Kikwete of Tanzania, the President of Rwanda, Paul Kagame, the Burundi leader, Pierre Nkurunziza and the President of the Democratic Republic of Congo (DRC), Joseph Kabila.<\/p>\n<p><a href=\"http:\/\/www.newvision.co.ug\/news\/666286-museveni-in-tanzania-for-central-corridor-rail-meet.html\">http:\/\/www.newvision.co.ug\/news\/666286-museveni-in-tanzania-for-central-corridor-rail-meet.html<\/a> (abgerufen 2015-11-13)<\/p>\n<hr \/>\n<h3>2014-02. Study on the Central Corridor Railway Revitalization and Energy Efficiency Project in the United Republic of Tanzania. February 2014<\/h3>\n<p>Tanzania Railway Ltd. The key issue in the subsector concerns the revival of TRL. The demise of rail services has resulted in a significant loss of traffic to road transport and the latter has benefitted from substantial investment in the trunk road network. The collapse of services has had a dramatic impact on trade in the central corridor.<\/p>\n<figure id=\"attachment_1594\" aria-describedby=\"caption-attachment-1594\" style=\"width: 493px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-1594\" src=\"http:\/\/www.rushwa.de\/wp-content\/uploads\/PADECO-February2014-300x291.jpg\" alt=\"TansanischeEisenbahn\" width=\"493\" height=\"478\" \/><figcaption id=\"caption-attachment-1594\" class=\"wp-caption-text\">TansanischeEisenbahn<\/figcaption><\/figure>\n<p>Study on Economic Partnership Projects in Developing Countries in FY2013 Study on the Central Corridor Railway Revitalization and Energy Efficiency Project in the United Republic of Tanzania February 2014, Prepared for: The Ministry of Economy, Trade and Industry, Ernst &amp; Young ShinNihon LLC, Japan External Trade Organization. Prepared by: PADECO Co., Ltd.NIPPON STEEL<\/p>\n<p><a href=\"http:\/\/www.meti.go.jp\/meti_lib\/report\/2014fy\/E003807.pdf\">http:\/\/www.meti.go.jp\/meti_lib\/report\/2014fy\/E003807.pdf<\/a><\/p>\n<hr \/>\n<h3>2013-09 Transport Sector Review. Transport &amp; ICT Department, September 2013<\/h3>\n<p><a href=\"http:\/\/www.afdb.org\/fileadmin\/uploads\/afdb\/Documents\/Project-and-Operations\/Tanzania_-_Transport_Sector_Review.pdf\">http:\/\/www.afdb.org\/fileadmin\/uploads\/afdb\/Documents\/Project-and-Operations\/Tanzania_-_Transport_Sector_Review.pdf<\/a><\/p>\n<p>Der Kurvenverlauf zeigt die Dramatik der Situation.<img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-1597\" src=\"http:\/\/www.rushwa.de\/wp-content\/uploads\/trl-freight-300x192.jpg\" alt=\"trl-freight\" width=\"445\" height=\"285\" srcset=\"https:\/\/www.rushwa.de\/wp-content\/uploads\/trl-freight-300x192.jpg 300w, https:\/\/www.rushwa.de\/wp-content\/uploads\/trl-freight.jpg 899w\" sizes=\"auto, (max-width: 445px) 100vw, 445px\" \/><\/p>\n<p>TANZANIA. Transport Sector Review. Transport &amp; ICT Department, September 2013, Seite 91<\/p>\n<hr \/>\n<h3>2012-10-03-Wajarumani Kufufua Reli ya Kati<\/h3>\n<p>Blog. Wednesday, October 3, 2012:\u00a0 (Central Line). Jamani, tuliachiwa reli nzuri na wakoloni, tukaizembea hadi ikaoza.\u00a0 Sasa inabidi warudi kuifufua zaidi ya miaka 50 ya Uhuru. Tunasonga mbele, au tunarudi nyuma?\u00a0 Ufisadi unaharibu nchi!<br \/><a href=\"http:\/\/mangiayoub.blogspot.de\/2012\/10\/wajarumani-kufufua-reli-ya-kati-central.html\">http:\/\/mangiayoub.blogspot.de\/2012\/10\/wajarumani-kufufua-reli-ya-kati-central.html<\/a> (abgerufen 2015-11-13)<\/p>\n<hr \/>\n<h3>2012-09-28-<strong>Germany Willing to Support Revival of Central Railway<\/strong><\/h3>\n<p>ippmedia. By Khalfan Said, 28th September 2012 (Ausz\u00fcge): The German government is ready to support the reviving of the ailing central railway line, the ambassador of the Federal Republic of Germany, Klaus Peter Brandes has revealed. Speaking at the embassy in Dar es Salaam yesterday, during the questions and answers session at a news brief on the upcoming second African Logistics Conference, (ALC), the envoy said, \u201cIf the government of Tanzania thinks that Germany can participate in reviving central railway line, we are ready,\u201d he affirmed.<\/p>\n<p>The envoy also said his government has been supporting many projects like water and electricity, as those were the projects picked by the government of Tanzania to receive assistance from German.\u00a0 \u201cSo far the government of Tanzania has not yet asked for German\u2019s support on the re-built central line,\u201d he clarified.<br \/><a href=\"http:\/\/www.ippmedia.com\/frontend\/functions\/print_article.php?l=46310\">http:\/\/www.ippmedia.com\/frontend\/functions\/print_article.php?l=46310<\/a> (abgerufen 9.3.2016)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u00a0 \u00a0 2015-08-12 TANZANIA INVESTING IN RAILWAYS Meldung von RailwaysAfrika 12 August 2015: Tanzania, Burundi and Rwanda suchen nach Investoren f\u00fcr den Bau der neue 1.661 Kilometer langen Standardspurbahn. Die Kosten werden auf 7,6 Milliarden US-Dollar gesch\u00e4tzt. \u201cProspective investors will design, finance, construct, operate and maintain the line under a public private partnership in collaboration &hellip; <a href=\"https:\/\/www.rushwa.de\/?page_id=86\" class=\"more-link\"><span class=\"screen-reader-text\">Central Line up to 2015<\/span> weiterlesen <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":91,"menu_order":33,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-86","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.rushwa.de\/index.php?rest_route=\/wp\/v2\/pages\/86","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.rushwa.de\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.rushwa.de\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.rushwa.de\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.rushwa.de\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=86"}],"version-history":[{"count":34,"href":"https:\/\/www.rushwa.de\/index.php?rest_route=\/wp\/v2\/pages\/86\/revisions"}],"predecessor-version":[{"id":2623,"href":"https:\/\/www.rushwa.de\/index.php?rest_route=\/wp\/v2\/pages\/86\/revisions\/2623"}],"up":[{"embeddable":true,"href":"https:\/\/www.rushwa.de\/index.php?rest_route=\/wp\/v2\/pages\/91"}],"wp:attachment":[{"href":"https:\/\/www.rushwa.de\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=86"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}